Occasionally, Colby Community College requests bids for large projects and purchases. Unless otherwise noted in the individual requests, all bids must be submitted to:
President Dr. Seth Carter
Colby Community College
1255 South Range Ave
Colby, KS 67701
Active RFPs
Welding Machines (due Sept. 22, 2023)
Past RFPs
Predictive Analytics Digital Solution
Feed Wagon for the College Farm
Furniture for the Agriculture Center
Website Redesign and Content Management System
Chiller Replacement for Campus Air Conditioner
Embree Hall Flooring Replacement (revised)
Bedker Memorial Complex Parking Lot Renovation
Integrated Institutional Software
Electronic Access Control System
Furniture Replacement (Rev. June 18)
Replacement of Two Vehicles (postponed)
Boiler for Bedker Memorial Complex
Furniture Replacement (postponed)
Flooring -- Bedker Memorial Complex and Cultural Arts Center
Roof for the Ceramics Building
Network Switches and Cabling Phase 2
Fiber Installation Cabling Phase II
Network Switches and Cabling, Phase I
Flooring for Bedker Memorial Complex
Flooring for Administrative Complex - Thomas Hall
Netting for indoor baseball/softball hitting cages
Network Cabling and Fiber Optic Educational Kits
Replacement of Library Planter Boxes
Furniture for Living Center East -- south section
Fiber Optic for Five Buildings
Fiber Optic Infrastructure, Big Blue Barn
Athletics Practice/Intramural Facility (Big Blue Barn)